Attention: All red marked fields have to be filled in:


Name:

Company:

E-Mail:

Questionnaire Assessment:
Give your opinion n/a poorly faulty enough good very
good
Remarks:
01 Are you sufficiently cared for to by our field service?
02 How are you greeted and assisted on the telephone?
03 Are we available (within reach) enough for you?
04 Do you receive our quotations upon your inquries in time?
05 Are you satisfied with the manner in which our quotations are prepared?
06 Do we excercise sufficient influence on the choise of raw-materials?
07 Do we have influence enough on the design- (review) of parts?
08 How do you rate our delivery terms and their observation?
09 Are we successful enough in fulfilling your drawing requirements?
  In case of non-conformity, where are the deviations? Length
tolerance
Diameter tolerance Shape/-
Position
Screw thread Surface finishing Surface treatment
10 Should the case arise, how are your complaints settled?
11 Are the requested documents sent along with the parts?
12 Are your parts packed according to your requirements?
Demand       not neces-
sary
inter-
ested
exactly what we need
13 Do you need an initial sample report with the actual dimensions for all the features?      
14 We make a control plan for all the operations of your parts      
15 Do you depend on the capability of the used turning automatics - we can determine the cmk-value      
16 Do you want to dispense with the quality conformance inspection, we issue you our control report      
17 Request a short view into our process capability - discuss your most important characteristics with us      
18 Conclude a one-year contract with us and we keep your parts ready to call-off in stock      
19 If you need a Process FMEA, we issue this based on your Construction FMEA      
20 You require a label for the purpose of raw-material identification ; we have the necessary re-stamping licence from SATI (inspection certificate 3.1B)
Inform us
21 To what extent do you need turned parts (purchasing volume)?    

 in 1000 EURO

 < 100
 < 500
> 500
22 How many key suppliers do you have for turned parts?        < 2
 < 5
 > 5
23 Which criterions influence your purchasing strategy at the most (quotation valuation)?        Price
 
 Quality
  Delivery-
terms